Wednesday, June 27, 2018

And so it begins...

After some back and forth with local barn builders and equipment operators I was able to determine where the barn should go on the property. My original plan was too big and too expensive. So I downsized but the new plan will still have plenty of room for the projects I want to tackle.

The barn will be 40’ W by 50’ L and 16’ H with two 12’ x 14’ overhead doors. The best place for access and minimum lot prep was located about 50’ from the road in the pasture just north/west of the house. I also plan on a 20' concrete patio off the back side, a good place to sit and relax and maybe wash a vehicle or two. Here is a rough approximation of the pole barn in a satellite view of our property. The yellow is where the building will sit, it doesn't show the 20' extension off the back.


Our 41’ fifth wheel will fit inside without the Freightliner but will most likely stay stored outside. When I need to perform some work on it, inside it will be. I really hate rolling around in the gravel to work on it. Six inches of concrete will support any of the toys we have as well as the 10,000 two-post lift I plan to buy. The pad will be stubbed out for a bathroom/shower as well as a small kitchen area. Layout to be determined.

The first step:
  • Get the ground prepped. This included fence and post removal, staking the foot print, grading the driveway and fill to level the building footprint.

Fence removal:

Driveway:
  • Prep the culvert
  • Install 40’ of 12” culvert pipe (Later replaced with smaller pipe due to damage and height)
  • Fill with gravel


Building footprint:
  • Skim off any top soil and pile South of the building site. This will be used later for backfill and grading.
  • Bring entire site to grade (many, many loads of fill brought in). Additional area on sides (10’) and rear (20’) brought to grade as well
  • I will compact this area per concrete contractor’s guidance.

Here are some pictures of the progress (click for larger photos):



Stay Tuned!




3 comments:

  1. Great blow by blow details, love it, just what us fellow RVrs need for in the future when we hope to settled down and follow in your footsteps. I had no idea all the work involved in the preparation phase!
    Guessing the two doodles have to remain in the house while you are working outside on your project!

    ReplyDelete
    Replies
    1. Thanks, the doodles will have the entire yard to play in when everything is done. Gonna movemthe fencing around to open it up. Then train them to get tools for me....I’ll let ya know how that works out.

      Delete
    2. During the build, they will be in the house or in the back yard. Fortunately, that is completely fenced off from the pasture area where we are building the garage.

      Delete